The main objective of this project is to develop a comprehensive Storm Water Master Plan for all populated area within the region of Hail for the 1450 H horizon and outside of it. This includes identification of critical areas or hotspots with general design of solutions to these critical areas.
CLIENT : Hail Municipality
SERVICES COMPLETION : On Going
PROJECT LOCATION : Hail
ALBWARDI ROLE : Mobilization, Soil test, Data Collection, Local Sources, data surveying, Geotechnical Study, Client Suppor
COST : SAR 9,300,375 million